-
Notifications
You must be signed in to change notification settings - Fork 1
Expand file tree
/
Copy pathMakefile
More file actions
102 lines (86 loc) · 3.54 KB
/
Makefile
File metadata and controls
102 lines (86 loc) · 3.54 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
# check for dependencies
SHELL := /bin/bash
deps = curl jq git python3
check_deps := $(foreach dep,$(deps), $(if $(shell which $(dep)),some string,$(error "No $(dep) in PATH!")))
# constants
packagename = clams
generatedcode = $(packagename)/ver
distname = $(packagename)_python
artifact = build/lib/$(packagename)
buildcaches = build/bdist* $(distname).egg-info __pycache__
testcaches = .hypothesis .pytest_cache .pytype coverage.xml htmlcov .coverage
.PHONY: all
.PHONY: clean
.PHONY: test
.PHONY: develop
.PHONY: publish
.PHONY: docs
.PHONY: package
.PHONY: devversion
all: version test build
develop: devversion package test
python3 setup.py develop --uninstall
python3 setup.py develop
publish: distclean version package test
test `git branch --show-current` = "master"
@git tag `cat VERSION`
@git push origin `cat VERSION`
$(generatedcode): VERSION
# this will generate the version subpackage inside clams package
python3 setup.py --help 2>/dev/null || echo "Ignore setuptools import error for now"
ls $(generatedcode)*
# generating jsonschema depends on mmif-python and pydantic
docs:
@echo "WARNING: The 'docs' target is deprecated and will be removed."
@echo "The 'docs' directory is no longer used. Documentation is now hosted in the central CLAMS documentation hub."
@echo "Use 'make doc' for local builds."
@echo "Nothing is done."
doc: VERSION
python3 build-tools/docs.py
package: VERSION
pip install --upgrade -r requirements.dev
python3 setup.py sdist
build: $(artifact)
$(artifact):
python3 setup.py build
# invoking `test` without a VERSION file will generated a dev version - this ensures `make test` runs unmanned
test: devversion $(generatedcode)
pip install --upgrade -r requirements.dev
pip install -r requirements.txt
pytype --config .pytype.cfg $(packagename)
python3 -m pytest --cov=$(packagename) --cov-report=xml
# helper functions
e :=
space := $(e) $(e)
## handling version numbers
macro = $(word 1,$(subst .,$(space),$(1)))
micro = $(word 2,$(subst .,$(space),$(1)))
patch = $(word 3,$(subst .,$(space),$(1)))
increase_patch = $(call macro,$(1)).$(call micro,$(1)).$$(($(call patch,$(1))+1))
## handling versioning for dev version
add_dev = $(call macro,$(1)).$(call micro,$(1)).$(call patch,$(1)).dev1
split_dev = $(word 2,$(subst .dev,$(space),$(1)))
increase_dev = $(call macro,$(1)).$(call micro,$(1)).$(call patch,$(1)).dev$$(($(call split_dev,$(1))+1))
devversion: VERSION.dev VERSION; cat VERSION
version: VERSION; cat VERSION
VERSION.dev: devver := $(shell curl --silent "https://api.github.com/repos/clamsproject/clams-python/git/refs/tags" | grep '"ref":' | sed -E 's/.+refs\/tags\/([0-9.]+)",/\1/g' | sort | tail -n 1)
VERSION.dev:
@if [ -z "$(devver)" ]; then if [ -e VERSION ] ; then cp VERSION{"",".dev"}; else echo "0.0.0.dev1" > VERSION.dev ; fi \
else if [[ "$(devver)" == *.dev* ]]; then echo $(call increase_dev,$(devver)); else echo $(call add_dev,$(call increase_patch, $(devver))); fi > VERSION.dev; \
fi
VERSION: version := $(shell git tag | sort -r | head -n 1)
VERSION:
@if [ -e VERSION.dev ] ; \
then cp VERSION.dev VERSION; \
else (read -p "Current version is ${version}, please enter a new version (default: increase *patch* level by 1): " new_ver; \
[ -z $$new_ver ] && echo $(call increase_patch,$(version)) || echo $$new_ver) > VERSION; \
fi
distclean:
@rm -rf dist $(artifact) build/bdist*
clean: distclean
@rm -rf VERSION VERSION.dev $(testcaches) $(buildcaches) $(generatedcode)
@rm -rf docs
@rm -rf .*cache
@rm -rf .hypothesis tests/.hypothesis
cleandocs:
@git checkout -- docs && git clean -fx docs