Skip to content

Fix amqp

Fix amqp #95

Triggered via pull request July 4, 2025 22:17
@abnegateabnegate
synchronize #51
fix-amqp
Status Cancelled
Total duration 1m 44s
Artifacts

tests.yml

on: pull_request
Matrix: Adapter Tests
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Adapter Tests (AMQPAck)
Process completed with exit code 255.
Adapter Tests (AMQPSwoole)
The operation was canceled.
Adapter Tests (AMQPSwoole)
Canceling since a higher priority waiting request for Tests-refs/pull/51/merge exists
Adapter Tests (AMQP)
The operation was canceled.
Adapter Tests (AMQP)
Canceling since a higher priority waiting request for Tests-refs/pull/51/merge exists
Adapter Tests (SwooleRedisCluster)
The operation was canceled.
Adapter Tests (SwooleRedisCluster)
Canceling since a higher priority waiting request for Tests-refs/pull/51/merge exists
Adapter Tests (Pool)
The operation was canceled.
Adapter Tests (Pool)
Canceling since a higher priority waiting request for Tests-refs/pull/51/merge exists
Adapter Tests (Swoole)
The operation was canceled.
Adapter Tests (Swoole)
Canceling since a higher priority waiting request for Tests-refs/pull/51/merge exists
Tests
Canceling since a higher priority waiting request for Tests-refs/pull/51/merge exists
Adapter Tests (Workerman)
The operation was canceled.
Adapter Tests (Workerman)
Canceling since a higher priority waiting request for Tests-refs/pull/51/merge exists