Skip to content

[Epic] Port Integration Test Reliability Improvements #2968

@robfrank

Description

@robfrank

Overview

Port improvements from branch claude/fix-failing-it-tests-0176P1zKUgLUsKhvAvGkQkbN to main branch. This epic tracks the systematic porting of integration test reliability improvements and production code modernization.

Goals

  • Reduce test flakiness from 15-20% to <1%
  • Modernize date handling with Java 21 pattern matching (43% complexity reduction)
  • Eliminate infinite loops in HA tests with Awaitility
  • Fix critical bug in RemoteDateIT
  • Establish patterns for distributed system testing

Scope

6 files changed:

  • engine/src/main/java/com/arcadedb/serializer/BinaryTypes.java
  • engine/src/main/java/com/arcadedb/utility/DateUtils.java
  • server/src/test/java/com/arcadedb/server/RemoteDateIT.java
  • server/src/test/java/com/arcadedb/server/ha/HARandomCrashIT.java
  • server/src/test/java/com/arcadedb/server/ha/HASplitBrainIT.java
  • server/src/test/java/com/arcadedb/server/ha/ReplicationChangeSchemaIT.java

Changes: 312 additions, 209 deletions

Documentation

Complete documentation available in repository:

  • 📋 IT_TEST_IMPROVEMENTS_SUMMARY.md - Executive summary
  • 🚀 PORTING_QUICK_START.md - Quick start guide
  • 📖 PORTING_PLAN_IT_TEST_IMPROVEMENTS.md - Detailed implementation plan
  • TASKS_IT_TEST_IMPROVEMENTS.md - Task breakdown
  • 🔬 ARCHITECTURAL_ANALYSIS_FIX_FAILING_IT_TESTS.md - Architecture analysis
  • 🧪 HA_TEST_RELIABILITY_ANALYSIS.md - Test reliability analysis

Sub-Issues

Phase 2: Production Code Modernization (50 min)

Phase 3: Test Infrastructure (60 min)

Phase 4: HA Test Reliability (150 min, can parallelize)

Phase 5: Testing & Validation (110 min)

Phase 6: Documentation (70 min)

Success Criteria

  • ✅ All tests pass: mvn clean install succeeds
  • ✅ Flakiness reduced: HA tests pass ≥95% (19/20 runs)
  • ✅ No hangs: All Awaitility waits have timeouts
  • ✅ Bug fixed: RemoteDateIT passes consistently
  • ✅ Performance maintained: Build time within ±10%

Implementation Workflow

Sequential (Safest)

  1. Modernize date handling with Java 21 pattern matching #2969 (Date modernization) → 2. Fix critical ResultSet bug in RemoteDateIT and refactor test #2970 (RemoteDateIT fix) → 3. Improve HARandomCrashIT reliability with Awaitility and exponential backoff #2971, Add thread safety and cluster stabilization to HASplitBrainIT #2972, Add schema propagation waits to ReplicationChangeSchemaIT #2973 (in any order) → 4. Testing and validation of ported improvements #2974 (Validation) → 5. Documentation and cleanup for IT test improvements #2975 (Documentation)

Parallel (Faster)

  1. Modernize date handling with Java 21 pattern matching #2969 → 2. Fix critical ResultSet bug in RemoteDateIT and refactor test #2970Then in parallel: Improve HARandomCrashIT reliability with Awaitility and exponential backoff #2971, Add thread safety and cluster stabilization to HASplitBrainIT #2972, Add schema propagation waits to ReplicationChangeSchemaIT #2973 → 4. Testing and validation of ported improvements #2974 → 5. Documentation and cleanup for IT test improvements #2975

Critical Path

#2969#2970 → (#2971 OR #2972 OR #2973) → #2974#2975

Timeline

Estimated: 9-10 hours total

  • Phase 2: 50 min (sequential)
  • Phase 3: 60 min (sequential)
  • Phase 4: 150 min (can parallelize into 50 min if 3 people work simultaneously)
  • Phase 5: 110 min (sequential)
  • Phase 6: 70 min (sequential)

Optimistic: 6-7 hours (parallel execution, no issues)
Pessimistic: 12-15 hours (sequential, with debugging)

Risk Assessment

Overall Risk: Medium
Production code changes: LOW risk (well-tested, straightforward)
Test infrastructure: MEDIUM risk (changes test behavior)
Value: HIGH (dramatic improvement in CI/CD reliability)

Progress Tracking

Use this checklist to track overall progress:

Source

Branch: claude/fix-failing-it-tests-0176P1zKUgLUsKhvAvGkQkbN

Commits:

  • 75164460a - fix: simplify date handling logic and improve readability in BinaryTypes and DateUtils
  • fde25a0ce - refactor test
  • 75ab91918 - fix: add missing Awaitility imports to IT tests
  • 50bbdb5aa - fix: improve reliability of HA and replication integration tests

Sub-issues

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions