Connects the orphan TimetableDesign problem to the main reduction graph via ILP (which has 15+ inbound reductions and connects to QUBO)
Enables solving TimetableDesign instances using any ILP solver through the standard reduction graph path
The natural ILP formulation — each constraint of TimetableDesign maps directly to a linear (in)equality
Enables removing the native solver hook in src/solvers/ilp/solver.rs:185 that currently bypasses the reduction graph for TimetableDesign (added in PR Fix #511: [Model] TimetableDesign #719 as a workaround). Once this rule lands, the hook should be removed and the existing solver dispatch test (test_timetable_design_issue_example_is_solved_via_ilp_solver_dispatch) should be reinforced as a standard closed-loop reduction test that exercises reduce_to() → BruteForce solve on ILP → extract_solution() → verify with evaluate().
Reference
Even, S., Itai, A., & Shamir, A. (1976). On the Complexity of Timetable and Multicommodity Flow Problems. SIAM Journal on Computing, 5(4), 691–703. DOI: 10.1137/0205048
The ILP formulation is the direct translation of the four constraints in the problem definition into linear (in)equalities over binary variables — a standard technique described in de Werra, D. (1985). "An introduction to timetabling," European Journal of Operational Research, 19(2), 151–162. DOI: 10.1016/0377-2217(85)90167-5
Reduction Algorithm
Given a TimetableDesign instance with $|C|$ craftsmen, $|T|$ tasks, $|H|$ work periods, availability sets $A_C(c) \subseteq H$ and $A_T(t) \subseteq H$, and requirements $R(c,t) \in \mathbb{Z}_{\geq 0}$:
Variables. Create one binary variable $x_{c,t,h} \in {0,1}$ for each triple $(c, t, h)$ where $h \in A_C(c) \cap A_T(t)$. Index the variables in craftsman-major, task-next, period-last order (matching the source model's configuration layout). Let $n$ be the total number of variables created.
Craftsman exclusivity. For each craftsman $c \in C$ and period $h \in H$, add the constraint: $$\sum_{t \in T : h \in A_T(t)} x_{c,t,h} \leq 1$$
(each craftsman works on at most one task per period). Total: $|C| \cdot |H|$ constraints.
Task exclusivity. For each task $t \in T$ and period $h \in H$, add the constraint: $$\sum_{c \in C : h \in A_C(c)} x_{c,t,h} \leq 1$$
(each task has at most one craftsman per period). Total: $|T| \cdot |H|$ constraints.
Requirement satisfaction. For each pair $(c, t) \in C \times T$, add the equality constraint: $$\sum_{h \in A_C(c) \cap A_T(t)} x_{c,t,h} = R(c,t)$$
Total: $|C| \cdot |T|$ constraints.
Objective. Set the objective to minimize $0$ (satisfaction problem — any feasible solution suffices).
Solution extraction. The binary vector $(x_{c,t,h})$ maps directly back to the source configuration: set $f(c,t,h) = x_{c,t,h}$ for available triples and $f(c,t,h) = 0$ otherwise.
Note: num_vars is the worst case (all triples available). The actual count may be smaller when availability restricts some triples.
Validation Method
Closed-loop test: construct a small TimetableDesign instance, reduce to ILP, solve ILP with brute force, extract solution back to TimetableDesign, and verify with evaluate(). The test instance must be small enough for brute-force on the resulting ILP (e.g., 2×2×2 giving 8 ILP vars → 256 configs).
Constraint cascade:$R(c_2, t_3) = 2$ with only 2 available periods forces $x_{c_2,t_3,h_1} = x_{c_2,t_3,h_2} = 1$. Craftsman exclusivity then fully books $c_2$ in both $h_1$ and $h_2$. Task exclusivity for $t_3$ blocks $c_1$ and $c_3$ from $t_3$ in those periods. Craftsman $c_1$ must fit tasks $t_1$, $t_2$, $t_4$ (each requiring 1 period) into the 3 available periods — one per period. Task exclusivity for $t_2$ then forces $c_3$ into whichever period $c_1$ doesn't use.
All 4 constraints satisfied: availability respected, no double booking, all requirements met. Answer: YES.
This example is non-trivial because $R(c_2, t_3) = 2$ forces a multi-period assignment, creating a constraint cascade through craftsman and task exclusivity that determines most of the solution.
Extra Remark
Native solver hook cleanup (from PR #719 review): PR #719 added a native backtracking solver for TimetableDesign inside ILPSolver::solve_dyn (src/solvers/ilp/solver.rs:185) because no ILP reduction path existed. Once this rule is implemented:
Remove the TimetableDesign branch from solve_dyn in src/solvers/ilp/solver.rs
Remove solve_via_required_assignments() from src/models/misc/timetable_design.rs
Convert test_timetable_design_issue_example_is_solved_via_ilp_solver_dispatch into a standard closed-loop reduction test (test_timetabledesign_to_ilp_closed_loop) that exercises reduce_to() → BruteForce solve on ILP → extract_solution() → evaluate(). Use a small instance (e.g., 2×2×2) for brute-force feasibility.
Verify that pred inspect correctly reports ILP as a supported solver and pred solve output accurately reflects the reduction path
BibTeX
@article{evenItaiShamir1976,
author = {Shimon Even and Alon Itai and Adi Shamir},
title = {On the Complexity of Timetable and Multicommodity Flow Problems},
journal = {SIAM Journal on Computing},
volume = {5},
number = {4},
pages = {691--703},
year = {1976},
doi = {10.1137/0205048},
}
@article{deWerra1985,
author = {Dominique de Werra},
title = {An Introduction to Timetabling},
journal = {European Journal of Operational Research},
volume = {19},
number = {2},
pages = {151--162},
year = {1985},
doi = {10.1016/0377-2217(85)90167-5},
}
Source
TimetableDesign
Target
ILP (binary)
Motivation
src/solvers/ilp/solver.rs:185that currently bypasses the reduction graph for TimetableDesign (added in PR Fix #511: [Model] TimetableDesign #719 as a workaround). Once this rule lands, the hook should be removed and the existing solver dispatch test (test_timetable_design_issue_example_is_solved_via_ilp_solver_dispatch) should be reinforced as a standard closed-loop reduction test that exercisesreduce_to()→ BruteForce solve on ILP →extract_solution()→ verify withevaluate().Reference
Even, S., Itai, A., & Shamir, A. (1976). On the Complexity of Timetable and Multicommodity Flow Problems. SIAM Journal on Computing, 5(4), 691–703. DOI: 10.1137/0205048
The ILP formulation is the direct translation of the four constraints in the problem definition into linear (in)equalities over binary variables — a standard technique described in de Werra, D. (1985). "An introduction to timetabling," European Journal of Operational Research, 19(2), 151–162. DOI: 10.1016/0377-2217(85)90167-5
Reduction Algorithm
Given a TimetableDesign instance with$|C|$ craftsmen, $|T|$ tasks, $|H|$ work periods, availability sets $A_C(c) \subseteq H$ and $A_T(t) \subseteq H$ , and requirements $R(c,t) \in \mathbb{Z}_{\geq 0}$ :
Variables. Create one binary variable$x_{c,t,h} \in {0,1}$ for each triple $(c, t, h)$ where $h \in A_C(c) \cap A_T(t)$ . Index the variables in craftsman-major, task-next, period-last order (matching the source model's configuration layout). Let $n$ be the total number of variables created.
Craftsman exclusivity. For each craftsman$c \in C$ and period $h \in H$ , add the constraint:
$$\sum_{t \in T : h \in A_T(t)} x_{c,t,h} \leq 1$$ $|C| \cdot |H|$ constraints.
(each craftsman works on at most one task per period). Total:
Task exclusivity. For each task$t \in T$ and period $h \in H$ , add the constraint:
$$\sum_{c \in C : h \in A_C(c)} x_{c,t,h} \leq 1$$ $|T| \cdot |H|$ constraints.
(each task has at most one craftsman per period). Total:
Requirement satisfaction. For each pair$(c, t) \in C \times T$ , add the equality constraint:
$$\sum_{h \in A_C(c) \cap A_T(t)} x_{c,t,h} = R(c,t)$$ $|C| \cdot |T|$ constraints.
Total:
Objective. Set the objective to minimize$0$ (satisfaction problem — any feasible solution suffices).
Solution extraction. The binary vector$(x_{c,t,h})$ maps directly back to the source configuration: set $f(c,t,h) = x_{c,t,h}$ for available triples and $f(c,t,h) = 0$ otherwise.
Size Overhead
num_varsnum_craftsmen * num_tasks * num_periodsnum_constraintsnum_craftsmen * num_periods + num_tasks * num_periods + num_craftsmen * num_tasksNote:
num_varsis the worst case (all triples available). The actual count may be smaller when availability restricts some triples.Validation Method
Closed-loop test: construct a small TimetableDesign instance, reduce to ILP, solve ILP with brute force, extract solution back to TimetableDesign, and verify with
evaluate(). The test instance must be small enough for brute-force on the resulting ILP (e.g., 2×2×2 giving 8 ILP vars → 256 configs).Example
Source (TimetableDesign): 3 craftsmen, 4 tasks, 3 periods.
Craftsman availability:
Task availability:
Requirements$R(c,t)$ :
Construction:
Available triples (24 of 36): for each$(c,t)$ , only periods in $A_C(c) \cap A_T(t)$ yield variables. This gives 24 binary ILP variables.
Key constraints:
Constraint cascade:$R(c_2, t_3) = 2$ with only 2 available periods forces $x_{c_2,t_3,h_1} = x_{c_2,t_3,h_2} = 1$ . Craftsman exclusivity then fully books $c_2$ in both $h_1$ and $h_2$ . Task exclusivity for $t_3$ blocks $c_1$ and $c_3$ from $t_3$ in those periods. Craftsman $c_1$ must fit tasks $t_1$ , $t_2$ , $t_4$ (each requiring 1 period) into the 3 available periods — one per period. Task exclusivity for $t_2$ then forces $c_3$ into whichever period $c_1$ doesn't use.
ILP solution (one of two valid):$c_1$ : $t_1 \to h_1$ , $t_2 \to h_2$ , $t_4 \to h_3$ ; $c_2$ : $t_3 \to h_1$ , $t_3 \to h_2$ ; $c_3$ : $t_2 \to h_3$ .
Extracted timetable:
All 4 constraints satisfied: availability respected, no double booking, all requirements met. Answer: YES.
This example is non-trivial because$R(c_2, t_3) = 2$ forces a multi-period assignment, creating a constraint cascade through craftsman and task exclusivity that determines most of the solution.
Extra Remark
Native solver hook cleanup (from PR #719 review): PR #719 added a native backtracking solver for TimetableDesign inside
ILPSolver::solve_dyn(src/solvers/ilp/solver.rs:185) because no ILP reduction path existed. Once this rule is implemented:TimetableDesignbranch fromsolve_dyninsrc/solvers/ilp/solver.rssolve_via_required_assignments()fromsrc/models/misc/timetable_design.rstest_timetable_design_issue_example_is_solved_via_ilp_solver_dispatchinto a standard closed-loop reduction test (test_timetabledesign_to_ilp_closed_loop) that exercisesreduce_to()→ BruteForce solve on ILP →extract_solution()→evaluate(). Use a small instance (e.g., 2×2×2) for brute-force feasibility.pred inspectcorrectly reports ILP as a supported solver andpred solveoutput accurately reflects the reduction pathBibTeX