Skip to content

(Layer 1 Excess + Lim) and (Layer 2 Excess + Lim) formulas are inconsistent. #27

@stufraser1

Description

@stufraser1

Formulas in column J needs to include addition of column I to be on a consistent basis (or alternatively could just use columns AG and AH from the [Financial Structure Input] tab. The dotted green line should be much higher than it is (450m).

I made this change - but maybe the chart is now not making so much sense. I also changed the majority of the calcs to be much simpler, referencing the top row of the table, rather than full calc in every row (processing reduction)

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

No type

Projects

No projects

Relationships

None yet

Development

No branches or pull requests

Issue actions