LET's SKF G5 (ex Astrium) chopper 5 will have been installed by 24/01/2020 (according to project plan). An additional IOC and OPI will need to be configured to communicate with it, as well as IBEX configuration(s) edited.
Notes
- Check that there are enough IOCs built (4 required in total), bearing in mind that chopper 1 will be replaced by an SKF G5 in the Summer.
- Two IOCs are already running for choppers 3 & 4, and so it should be straightforward to configure one more.