-
Notifications
You must be signed in to change notification settings - Fork 505
METRON-1690: Add more context to PcapJob JobStatus #1128
METRON-1690: Add more context to PcapJob JobStatus #1128
Conversation
|
+1 by inspection |
|
+1, thanks for the contribution! |
|
I tested this in full dev by submitting a query with a time range that won't match the pcap data I have in An appropriate message was returned: I also ran a query with an input path that doesn't have any data: and again received an appropriate response: |
|
Actually I did find a problem. When I submit a normal query where results are included in the time range, I get: The jobId is missing. |
|
@merrimanr - I added "SUBMITTED" as a new separate status where the MR job has been submitted but we potentially don't have a job ID yet. Let me check the API on whether we can return that reliably or not. |
|
@merrimanr - heads up this has been updated to address the jobId missing on submission |
|
I tested this again and it looks like the job id is present now. +1 |
|
Merged into feature branch. |
Contributor Comments
https://issues.apache.org/jira/browse/METRON-1690
Adds more context for failure scenarios to the JobStatus object returned by PcapJob. Removes duplication between Timer status updates and the getStatus call.
Pull Request Checklist
Follow test plan from the following: #1109
In order to streamline the review of the contribution we ask you follow these guidelines and ask you to double check the following:
For all changes:
For code changes:
Have you included steps to reproduce the behavior or problem that is being changed or addressed?
Have you included steps or a guide to how the change may be verified and tested manually?
Have you ensured that the full suite of tests and checks have been executed in the root metron folder via:
Have you written or updated unit tests and or integration tests to verify your changes?
Have you verified the basic functionality of the build by building and running locally with Vagrant full-dev environment or the equivalent?
For documentation related changes:
Have you ensured that format looks appropriate for the output in which it is rendered by building and verifying the site-book? If not then run the following commands and the verify changes via
site-book/target/site/index.html:Note:
Please ensure that once the PR is submitted, you check travis-ci for build issues and submit an update to your PR as soon as possible.
It is also recommended that travis-ci is set up for your personal repository such that your branches are built there before submitting a pull request.