-
-
Notifications
You must be signed in to change notification settings - Fork 847
Open
Labels
Complexity: MediumDraftIssue is still in the process of being createdIssue is still in the process of being createdP-Feature: Sitemaphttps://www.hackforla.org/sitemap/https://www.hackforla.org/sitemap/role: designrole: productProduct ManagementProduct Managementsize: 1ptCan be done in 4-6 hoursCan be done in 4-6 hours
Milestone
Description
Dependency
Overview
We need to fix any elements on the Site Map page that are missing or need to be updated to ensure the components in the Site Map are correct
Details
Components in the sitemap change across the homepage sub pages, footer, and future pages.
Action Items
- Review the completed Site Map audit and identify all elements flagged as:
- Missing text components
- Not connected to the Design System
- Incorrect or inconsistent components
- Locate the most recent approved Figma frame of the Site Map page (pink-framed version from the audit).
- For each flagged element:
- Replace any detached or local text styles with the correct Design System text components.
- Reconnect components that are not properly linked to the Design System.
- Replace incorrect components with the appropriate approved component variant.
- Ensure component usage is consistent across:
- Homepage subpages
- Footer
- Any referenced future pages
- If structural updates are required:
- Create a new copy of the corrected Site Map page to the right of the audited frame.
- Apply all fixes to the new version.
- Move the pink frame to the updated version once complete.
- Confirm all text elements are properly labeled and connected to the Design System before marking complete.
- Review the updated page with the Design Lead to confirm all issues identified in the audit have been resolved.
Resources/Instructions
- 1.01 Site Map page: https://www.hackforla.org/sitemap
Reactions are currently unavailable
Metadata
Metadata
Assignees
Labels
Complexity: MediumDraftIssue is still in the process of being createdIssue is still in the process of being createdP-Feature: Sitemaphttps://www.hackforla.org/sitemap/https://www.hackforla.org/sitemap/role: designrole: productProduct ManagementProduct Managementsize: 1ptCan be done in 4-6 hoursCan be done in 4-6 hours
Type
Projects
Status
New Issue Approval