## Expected Behavior Operator should be able to configure which bus is used when a Flow is created. ## Actual Behavior Today this is hard coded in the flow controller (with a TODO). ## Steps to Reproduce the Problem 1. 2. 3. ## Additional Info
Expected Behavior
Operator should be able to configure which bus is used when a Flow is created.
Actual Behavior
Today this is hard coded in the flow controller (with a TODO).
Steps to Reproduce the Problem
Additional Info