Skip to content

Order Spare Mooring Hardware #87

@neaptide

Description

@neaptide

Order from Mooring Systems for Turnaround Cruise January 2018

Have Need Item Code Item
2 2 GCBS-7/8 7/8" galvanized, safety chain shackle, Crosby
2 2 GCBS-3/4 3/4" galvanized, safety chain shackle, Crosby
4 8 GABS-3/4 3/4" galvanized anchor bolt shackle, Crosby
1 6 GABS-5/8 5/8" galvanized anchor bolt shackle, Crosby
1 6 GPL-3/4 3/4" galvanized pear link, Crosby

Notes:

  1. Added pear link and anchor shackle at swivel to be able to break above and below swivel.

  2. Substitute 3/4" anchor shackle for 5/8" shackle to accommodate Hammerhead termination on wire rope, but still have standard termination at other end (just above the swivel) and need one 5/8 shackle.

  • Determine links and shackles needed and what spares we already have.
  • What spares do we already have? A: see table above
  • What size/type of shackle to accommodate the Hammerhead termination? A: 3/4" anchor shackle
  • Add notes to documentation and drawings for 2018 Turnaround
  • place order with Mooring Systems
  • delivery to Woods Hole

Metadata

Metadata

Assignees

Type

No type

Projects

No projects

Relationships

None yet

Development

No branches or pull requests

Issue actions