Skip to content

ebnf show errors (#17025)#17028

Merged
ti-chi-bot[bot] merged 1 commit into
pingcap:release-8.0from
ti-chi-bot:cherry-pick-17025-to-release-8.0
Apr 8, 2024
Merged

ebnf show errors (#17025)#17028
ti-chi-bot[bot] merged 1 commit into
pingcap:release-8.0from
ti-chi-bot:cherry-pick-17025-to-release-8.0

Conversation

@ti-chi-bot
Copy link
Copy Markdown
Member

This is an automated cherry-pick of #17025

First-time contributors' checklist

What is changed, added or deleted? (Required)

Which TiDB version(s) do your changes apply to? (Required)

Tips for choosing the affected version(s):

By default, CHOOSE MASTER ONLY so your changes will be applied to the next TiDB major or minor releases. If your PR involves a product feature behavior change or a compatibility change, CHOOSE THE AFFECTED RELEASE BRANCH(ES) AND MASTER.

For details, see tips for choosing the affected versions (in Chinese).

  • master (the latest development version)
  • v8.1 (TiDB 8.1 versions)
  • v8.0 (TiDB 8.0 versions)
  • v7.6 (TiDB 7.6 versions)
  • v7.5 (TiDB 7.5 versions)
  • v7.4 (TiDB 7.4 versions)
  • v7.1 (TiDB 7.1 versions)
  • v6.5 (TiDB 6.5 versions)
  • v6.1 (TiDB 6.1 versions)
  • v5.4 (TiDB 5.4 versions)
  • v5.3 (TiDB 5.3 versions)
  • v5.2 (TiDB 5.2 versions)
  • v5.1 (TiDB 5.1 versions)
  • v5.0 (TiDB 5.0 versions)

What is the related PR or file link(s)?

Do your changes match any of the following descriptions?

  • Delete files
  • Change aliases
  • Need modification after applied to another branch
  • Might cause conflicts after applied to another branch

@ti-chi-bot ti-chi-bot added lgtm needs-1-more-lgtm Indicates a PR needs 1 more LGTM. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.0 This PR is cherry-picked to release-8.0 from a source PR. type/enhancement The issue or PR belongs to an enhancement. labels Apr 8, 2024
@ti-chi-bot ti-chi-bot mentioned this pull request Apr 8, 2024
19 tasks
@hfxsd
Copy link
Copy Markdown
Collaborator

hfxsd commented Apr 8, 2024

/approve

@ti-chi-bot
Copy link
Copy Markdown

ti-chi-bot Bot commented Apr 8, 2024

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: hfxsd

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@ti-chi-bot ti-chi-bot Bot added the approved label Apr 8, 2024
@ti-chi-bot ti-chi-bot Bot merged commit 2a303ff into pingcap:release-8.0 Apr 8, 2024
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved lgtm needs-1-more-lgtm Indicates a PR needs 1 more LGTM. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.0 This PR is cherry-picked to release-8.0 from a source PR. type/enhancement The issue or PR belongs to an enhancement.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants