Add a workflow to sync commits to ruby/ruby #137
test.yml
on: pull_request
ruby-versions
/
Generate Ruby versions
4s
Matrix: build
Annotations
20 errors
|
build (2.4 / ubuntu-latest)
Process completed with exit code 1.
|
|
build (2.6 / ubuntu-latest)
The strategy configuration was canceled because "build._2_4_ubuntu-latest" failed
|
|
build (jruby / ubuntu-latest)
The operation was canceled.
|
|
build (jruby / ubuntu-latest)
The strategy configuration was canceled because "build._2_4_ubuntu-latest" failed
|
|
build (2.7 / macos-latest)
The operation was canceled.
|
|
build (2.7 / macos-latest)
The strategy configuration was canceled because "build._2_4_ubuntu-latest" failed
|
|
build (2.7 / ubuntu-latest)
The operation was canceled.
|
|
build (2.7 / ubuntu-latest)
The strategy configuration was canceled because "build._2_4_ubuntu-latest" failed
|
|
build (jruby-head / ubuntu-latest)
The operation was canceled.
|
|
build (2.4 / macos-13)
The operation was canceled.
|
|
build (jruby-head / ubuntu-latest)
The strategy configuration was canceled because "build._2_4_ubuntu-latest" failed
|
|
build (2.4 / macos-13)
The strategy configuration was canceled because "build._2_4_ubuntu-latest" failed
|
|
build (2.6 / macos-latest)
The operation was canceled.
|
|
build (2.6 / macos-latest)
The strategy configuration was canceled because "build._2_4_ubuntu-latest" failed
|
|
build (jruby / macos-latest)
The operation was canceled.
|
|
build (jruby / macos-latest)
The strategy configuration was canceled because "build._2_4_ubuntu-latest" failed
|
|
build (2.5 / macos-13)
The operation was canceled.
|
|
build (2.5 / macos-13)
The strategy configuration was canceled because "build._2_4_ubuntu-latest" failed
|
|
build (jruby-head / macos-latest)
The operation was canceled.
|
|
build (jruby-head / macos-latest)
The strategy configuration was canceled because "build._2_4_ubuntu-latest" failed
|