Skip to content

Advance RFC #0889 to Stage Ready for Release#890

Merged
wagenet merged 1 commit intomasterfrom
advance-rfc-0889
Jan 10, 2023
Merged

Advance RFC #0889 to Stage Ready for Release#890
wagenet merged 1 commit intomasterfrom
advance-rfc-0889

Conversation

@emberjs-rfcs-bot
Copy link
Collaborator

@emberjs-rfcs-bot emberjs-rfcs-bot commented Dec 29, 2022

Advance #889 to the Ready For Release Stage

Summary

This pull request is advancing the RFC to the Ready For Release Stage.

An FCP is required before merging this PR to advance.

Upon merging this PR, automation will open a draft PR for this RFC to move to the Released Stage.

Ready for Release Stage Description

This stage is complete when the implementation is complete according to plan outlined in the RFC, and is in harmony with any changes in Ember that have occurred since the RFC was first written. This includes any necessary learning materials. At this stage, features or deprecations may be available for use behind a feature flag, or with an optional package, etc.

For codebase changes, there are no open questions that are anticipated to require breaking changes; the Ember team is ready to commit to the stability of any interfaces exposed by the current implementation of the feature.

This stage should include a list of criteria for determining when the proposal can be considered Recommended after being Released.

An FCP is required to move into this stage.

Each Ember core team will be requested as a reviewer on the PR to move into this stage. A representative of each team adds a review. If a team does not respond to the request, and after the conclusion of the FCP, it is assumed that the release may proceed.

Checklist to move to Ready for Release

  • Implementation is complete according to plan outlined in the RFC, with any adjustments noted in the RFC
  • Any necessary learning materials have been updated: Add ember-error deprecation ember-learn/deprecation-app#1255
  • The Ember team is ready to commit to the stability of any interfaces exposed by the current implementation of the feature. This is the go/no go decision for any feature flags, but the flags should only be turned on when moving to Released.
  • Criteria for moving to the Recommended Stage has been filled out
  • This PR has been converted from a draft to a regular PR and the Final Comment Period label has been added to start the FCP
  • Each team has been added as a reviewer to the PR at the start of the FCP. Reviews are not required by the end of the FCP. This is a notification step.
    • Framework @emberjs/framework
    • Data @emberjs/ember-data-core
    • CLI @emberjs/cli
    • Learning @emberjs/learning-core
    • Typescript @emberjs/typescript-core
    • Steering @emberjs/steering

Criteria for moving to Recommended (required)

No special criteria. Once it is released, it is essentially done.

Track Implementation

@wagenet wagenet requested review from a team and wagenet and removed request for wagenet January 3, 2023 22:27
@wagenet wagenet marked this pull request as ready for review January 3, 2023 22:28
@wagenet
Copy link
Member

wagenet commented Jan 3, 2023

I've moved this to Final Comment Period so we can get it into 4.10. This did not go through the normal process of having a Core Team meeting. However, the implementation here is trivial and the original RFC did go through FCP.

I should also be noted that the associated PRs have not yet been merged since one they are merged they will go live / be in the next release.

One open question is how we should be publishing the code mod. Should this just be listed in the entry on the deprecation website?

@wagenet wagenet removed the request for review from a team January 6, 2023 19:12
@wagenet wagenet added S-Ready for Release PR to move to the Ready for Release Stage RFC Advancement labels Jan 6, 2023
@wagenet wagenet merged commit 848c984 into master Jan 10, 2023
@delete-merged-branch delete-merged-branch bot deleted the advance-rfc-0889 branch January 10, 2023 19:08
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Final Comment Period RFC Advancement S-Ready for Release PR to move to the Ready for Release Stage

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants