Skip to content

add extended statistics doc#11384

Closed
TomShawn wants to merge 10 commits into
pingcap:masterfrom
TomShawn:add-extended-statistics
Closed

add extended statistics doc#11384
TomShawn wants to merge 10 commits into
pingcap:masterfrom
TomShawn:add-extended-statistics

Conversation

@TomShawn
Copy link
Copy Markdown
Contributor

What is changed, added or deleted? (Required)

add extended statistics doc

Which TiDB version(s) do your changes apply to? (Required)

Tips for choosing the affected version(s):

By default, CHOOSE MASTER ONLY so your changes will be applied to the next TiDB major or minor releases. If your PR involves a product feature behavior change or a compatibility change, CHOOSE THE AFFECTED RELEASE BRANCH(ES) AND MASTER.

For details, see tips for choosing the affected versions (in Chinese).

  • master (the latest development version)
  • v6.3 (TiDB 6.3 versions)
  • v6.1 (TiDB 6.1 versions)
  • v5.4 (TiDB 5.4 versions)
  • v5.3 (TiDB 5.3 versions)
  • v5.2 (TiDB 5.2 versions)
  • v5.1 (TiDB 5.1 versions)
  • v5.0 (TiDB 5.0 versions)

What is the related PR or file link(s)?

Do your changes match any of the following descriptions?

  • Delete files
  • Change aliases
  • Need modification after applied to another branch
  • Might cause conflicts after applied to another branch

@ti-chi-bot
Copy link
Copy Markdown
Member

[REVIEW NOTIFICATION]

This pull request has not been approved.

To complete the pull request process, please ask the reviewers in the list to review by filling /cc @reviewer in the comment.
After your PR has acquired the required number of LGTMs, you can assign this pull request to the committer in the list by filling /assign @committer in the comment to help you merge this pull request.

The full list of commands accepted by this bot can be found here.

Details

Reviewer can indicate their review by submitting an approval review.
Reviewer can cancel approval by submitting a request changes review.

@ti-chi-bot ti-chi-bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Sep 22, 2022
@TomShawn TomShawn marked this pull request as ready for review September 22, 2022 08:05
@ti-chi-bot ti-chi-bot added missing-translation-status This PR does not have translation status info. and removed do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. labels Sep 22, 2022
@ti-chi-bot ti-chi-bot added the size/L Denotes a PR that changes 100-499 lines, ignoring generated files. label Sep 22, 2022
@TomShawn TomShawn requested review from winoros and removed request for shichun-0415 September 22, 2022 08:07
@TomShawn TomShawn added translation/from-docs This PR is translated from a PR in pingcap/docs. add-missing-docs Add missing system variables, configuration items, and experimental features to documentation needs-cherry-pick-release-6.2 area/planner Indicates that the Issue or PR belongs to the area of SQL planner or optimizer. and removed missing-translation-status This PR does not have translation status info. labels Sep 22, 2022
@TomShawn TomShawn requested a review from lilin90 September 22, 2022 08:09
@TomShawn
Copy link
Copy Markdown
Contributor Author

/verify

@TomShawn TomShawn added the needs-cherry-pick-release-6.1 Should cherry pick this PR to release-6.1 branch. label Sep 23, 2022
Comment thread extended-statistics.md Outdated
@songrijie
Copy link
Copy Markdown
Contributor

rest LGTM

Comment thread extended-statistics.md Outdated
Comment thread extended-statistics.md Outdated
Comment thread extended-statistics.md Outdated
@ti-chi-bot ti-chi-bot added the needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. label Nov 11, 2022
@ti-chi-bot
Copy link
Copy Markdown
Member

@TomShawn: PR needs rebase.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

@qiancai
Copy link
Copy Markdown
Collaborator

qiancai commented Feb 24, 2023

Removed the needs-cherry-pick-release-6.3 label because the v6.3 docs have been archived at https://docs-archive.pingcap.com/zh/tidb/v6.3 and will no longer receive new updates.

@qiancai
Copy link
Copy Markdown
Collaborator

qiancai commented Apr 6, 2023

Removed the needs-cherry-pick-release-6.4 label because the v6.4 docs have been archived at https://docs-archive.pingcap.com/zh/tidb/v6.4 and will no longer receive new updates.

@qiancai
Copy link
Copy Markdown
Collaborator

qiancai commented Jul 7, 2023

Removed the needs-cherry-pick-release-6.6 label because the v6.6 docs have been archived at https://docs-archive.pingcap.com/zh/tidb/v6.6 and will no longer receive new updates.

@ti-chi-bot
Copy link
Copy Markdown

ti-chi-bot Bot commented Jan 26, 2024

@TomShawn: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
pull-verify 92c5e94 link true /test pull-verify

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository. I understand the commands that are listed here.

@lilin90
Copy link
Copy Markdown
Member

lilin90 commented May 13, 2024

Note: Since many conflicts exist in this PR after a long period of time, and some descriptions are outdated compared with the English version, I'll close this PR and create another one later.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

add-missing-docs Add missing system variables, configuration items, and experimental features to documentation area/planner Indicates that the Issue or PR belongs to the area of SQL planner or optimizer. needs-cherry-pick-release-6.1 Should cherry pick this PR to release-6.1 branch. needs-cherry-pick-release-6.5 Should cherry pick this PR to release-6.5 branch. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. translation/from-docs This PR is translated from a PR in pingcap/docs.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants